Purbrook Way / Riders Lane (Shaft W5)

Share Purbrook Way / Riders Lane (Shaft W5) on Facebook Share Purbrook Way / Riders Lane (Shaft W5) on X (formerly Twitter) Share Purbrook Way / Riders Lane (Shaft W5) on Linkedin Email Purbrook Way / Riders Lane (Shaft W5) link

As part of the Havant Thicket Reservoir project, we are installing two pipelines to carry water to the reservoir and supply water when needed.

The pipeline will be constructed using micro-tunnelling technology between a series of access shafts along the route. Shaft W5 be located immediately north of Purbrook Way, opposite the junction with the southern part of Riders Lane.

You can also view an overview map of the reservoir pipelines route by clicking here, or access our more detailed online map, where you can give us your comments by placing a virtual pin.

What we will be doing and when

Shaft W5 continues the pipeline construction, which began in April 2026, and will allow us to build the sixth section of pipework along the route.

Where we are now

Construction of Shafts W1, W2 and W3 is now largely complete and building work for Shaft W4 is due to begin in November. Tunnelling work will begin between Shaft W2 at Hooks Lane Playing Fields, and Shaft W1 at the start of 2027.

What's next

Preparation work for the construction of Shaft W5 will begin soon, with site set-up starting 23 November 2026. Construction for this shaft will include the following activities:

Construction of Shaft W5

Duration: approximately 3 months

Shaft W5 will be made of concrete and will be around 11 metres in diameter and 11 metres in depth. It will also have a fully enclosed compound around it. The compound entrance will be on the eastern side of Riders Lane, just north of its junction with Purbrook Way.

Construction of tunnelled pipeline section

Duration: approximately 14 months

Once Shaft W5 has been completed, tunnelling work will begin to connect it to the Reservoir Discharge Chamber, located at Corhampton Crescent. Once this work is completed, tunnelling will begin between Shaft W5 and Shaft W6, located on Dunsbury Way.

The tunnelling work will be well below roads, footpaths, public spaces, utilities like gas and water pipes and electricity cables. The route has been carefully designed to avoid passing directly beneath homes, and the pipelines will be installed significantly deeper than any building foundations.

As with all construction projects of this size, we will provide ongoing updates throughout with more information on our planned works.

Final fit-out out of Shaft W5

Duration: approximately 6 months

Once tunnelling work has finished, reinstatement work will start to return the construction area around Shaft W5 to return the area to its original condition.

How the construction work will impact you

Working with local authorities, we have developed plans to manage construction traffic and keep disruption to a minimum. Although every effort will be made to reduce impacts, while work is taking place you may experience:

  • Temporary traffic arrangements
  • Temporary footpath diversions
  • Temporary relocation of bus stop
  • Parking restrictions around construction sites
  • Noise from construction sites involved in micro-tunnelling, although we will need to keep within limits agreed with Havant Borough Council

Construction traffic

Vehicles will access the site using a designated route from the west via Purbrook Way, Dunsbury Way, Bramdean Drive and Riders Lane. A map showing further detail on the route is available on our reservoir pipelines webpages.

On average, each day there will be 4 return trips by HGVs or our tractor and trailer unit. Where possible, journeys will avoid peak times.

Temporary traffic arrangements

A section of Riders Lane, running north from its junction with Purbrook Way, will be temporarily closed for the duration of the pipelines works.

This is to allow safe access to site for construction traffic. A clearly signposted diversion route for traffic will be in place via Purbrook Way, Botley Drive and Highclere Avenue.

Temporary footpath diversion

The footpath on the northern side of Purbrook Way (section between Riders Lane and Ellisfield Road)

will be temporarily diverted for the duration of the works. The diversion will run along the southern side of road, using an existing pedestrian crossing point. This arrangement is needed due to the space required in this area for our construction compound.

Temporary relocation of bus stop

For the duration of the works, the stop on the northern side of Purbrook Way (between Riders Lane and Ellisfield Road) will be relocated a short distance away from its current site.

Parking restrictions around construction sites

Due to the partial closure of Riders Lane, to allow safe access for construction vehicles to site, parking will need be suspended in a part of Riders Lane for the duration of the pipelines works.

In total, 9 spaces will be temporarily taken out of use. These will be on the section of Riders Lane immediately to the north of Purbrook Way.

Notices will be put up ahead of the parking suspension starting, with clear signage in place while these temporary arrangements apply.

How to get in touch

If you have a question or comment, you can send it to us using the ‘Ask us a question’ tool on this page. You can also leave a virtual pin including feedback on our reservoir pipelines online map.

We will also hold a public drop-in session where you can meet our team and raise questions or concerns you may have:

  • Date: 18 November 2026
  • Time: 5pm to 8pm
  • Location: Leigh Park Centre, Dunsbury Way, Leigh Park, Havant PO9 5BG.

Of course, you can contact us by sending an email to havantthicket@portsmouthwater.co.uk, or by calling 023 9249 9888.

And you can write to us at: Havant Thicket Reservoir project, Portsmouth Water, PO Box 99, West Street, Havant, PO9 1LG.

As part of the Havant Thicket Reservoir project, we are installing two pipelines to carry water to the reservoir and supply water when needed.

The pipeline will be constructed using micro-tunnelling technology between a series of access shafts along the route. Shaft W5 be located immediately north of Purbrook Way, opposite the junction with the southern part of Riders Lane.

You can also view an overview map of the reservoir pipelines route by clicking here, or access our more detailed online map, where you can give us your comments by placing a virtual pin.

What we will be doing and when

Shaft W5 continues the pipeline construction, which began in April 2026, and will allow us to build the sixth section of pipework along the route.

Where we are now

Construction of Shafts W1, W2 and W3 is now largely complete and building work for Shaft W4 is due to begin in November. Tunnelling work will begin between Shaft W2 at Hooks Lane Playing Fields, and Shaft W1 at the start of 2027.

What's next

Preparation work for the construction of Shaft W5 will begin soon, with site set-up starting 23 November 2026. Construction for this shaft will include the following activities:

Construction of Shaft W5

Duration: approximately 3 months

Shaft W5 will be made of concrete and will be around 11 metres in diameter and 11 metres in depth. It will also have a fully enclosed compound around it. The compound entrance will be on the eastern side of Riders Lane, just north of its junction with Purbrook Way.

Construction of tunnelled pipeline section

Duration: approximately 14 months

Once Shaft W5 has been completed, tunnelling work will begin to connect it to the Reservoir Discharge Chamber, located at Corhampton Crescent. Once this work is completed, tunnelling will begin between Shaft W5 and Shaft W6, located on Dunsbury Way.

The tunnelling work will be well below roads, footpaths, public spaces, utilities like gas and water pipes and electricity cables. The route has been carefully designed to avoid passing directly beneath homes, and the pipelines will be installed significantly deeper than any building foundations.

As with all construction projects of this size, we will provide ongoing updates throughout with more information on our planned works.

Final fit-out out of Shaft W5

Duration: approximately 6 months

Once tunnelling work has finished, reinstatement work will start to return the construction area around Shaft W5 to return the area to its original condition.

How the construction work will impact you

Working with local authorities, we have developed plans to manage construction traffic and keep disruption to a minimum. Although every effort will be made to reduce impacts, while work is taking place you may experience:

  • Temporary traffic arrangements
  • Temporary footpath diversions
  • Temporary relocation of bus stop
  • Parking restrictions around construction sites
  • Noise from construction sites involved in micro-tunnelling, although we will need to keep within limits agreed with Havant Borough Council

Construction traffic

Vehicles will access the site using a designated route from the west via Purbrook Way, Dunsbury Way, Bramdean Drive and Riders Lane. A map showing further detail on the route is available on our reservoir pipelines webpages.

On average, each day there will be 4 return trips by HGVs or our tractor and trailer unit. Where possible, journeys will avoid peak times.

Temporary traffic arrangements

A section of Riders Lane, running north from its junction with Purbrook Way, will be temporarily closed for the duration of the pipelines works.

This is to allow safe access to site for construction traffic. A clearly signposted diversion route for traffic will be in place via Purbrook Way, Botley Drive and Highclere Avenue.

Temporary footpath diversion

The footpath on the northern side of Purbrook Way (section between Riders Lane and Ellisfield Road)

will be temporarily diverted for the duration of the works. The diversion will run along the southern side of road, using an existing pedestrian crossing point. This arrangement is needed due to the space required in this area for our construction compound.

Temporary relocation of bus stop

For the duration of the works, the stop on the northern side of Purbrook Way (between Riders Lane and Ellisfield Road) will be relocated a short distance away from its current site.

Parking restrictions around construction sites

Due to the partial closure of Riders Lane, to allow safe access for construction vehicles to site, parking will need be suspended in a part of Riders Lane for the duration of the pipelines works.

In total, 9 spaces will be temporarily taken out of use. These will be on the section of Riders Lane immediately to the north of Purbrook Way.

Notices will be put up ahead of the parking suspension starting, with clear signage in place while these temporary arrangements apply.

How to get in touch

If you have a question or comment, you can send it to us using the ‘Ask us a question’ tool on this page. You can also leave a virtual pin including feedback on our reservoir pipelines online map.

We will also hold a public drop-in session where you can meet our team and raise questions or concerns you may have:

  • Date: 18 November 2026
  • Time: 5pm to 8pm
  • Location: Leigh Park Centre, Dunsbury Way, Leigh Park, Havant PO9 5BG.

Of course, you can contact us by sending an email to havantthicket@portsmouthwater.co.uk, or by calling 023 9249 9888.

And you can write to us at: Havant Thicket Reservoir project, Portsmouth Water, PO Box 99, West Street, Havant, PO9 1LG.