Reservoir Discharge Chamber

Share Reservoir Discharge Chamber on Facebook Share Reservoir Discharge Chamber on X (formerly Twitter) Share Reservoir Discharge Chamber on Linkedin Email Reservoir Discharge Chamber link

As part of the Havant Thicket Reservoir project, we are installing two pipelines to carry water to the reservoir and supply water when needed.

To construct the pipelines, we will be building a Discharge Chamber that will initially allow us to remove one of our Micro-Tunnel Boring Machines (MTBM) from underground once it has built sections of the pipelines.

The Discharge Chamber chamber will be located in the green open space just south of the western end of Corhampton Crescent, near to the Hermitage Stream.

In the longer-term, the chamber will also form part of the system to allow water from the reservoir to be released in a controlled and safe way into the Hermitage Stream, in the unlikely event that the water levels of the reservoir need to be lowered quickly.

As with all construction projects of this size, we will provide ongoing updates throughout with more information on our planned works.

You can also view an overview map of the reservoir pipelines route and discharge point by clicking here, or access our more detailed online map, where you can give us your comments by placing a virtual pin.

What we will be doing and when

Work at the Discharge Chamber site is due to begin in November 2026 and will be carried out in a series of phases, before being completed in 2028.

Where we are now

Initial work to set up the Discharge Chamber working area should get underway in mid to late November 2026. Before this, we will complete an ecological survey of a tree that may contain bats. Following the survey, the site will be prepared for construction.

Setting up the site will include erecting hoarding and fencing with CCTV for security, installing noise control measures and a temporary site access road leading from Purbrook Way.

What's next

Construction work will begin in early 2027 and will include the following activities:

  • Quarter 1 = January to March
  • Quarter 2 = April to June
  • Quarter 3 = July to September
  • Quarter 4 = October to December

Construction of Discharge Chamber

Quarter 1 2027

The circular chamber will be located south of Corhampton Crescent. Once complete it will be around 13 metres in diameter and 10 metres in depth, with a fully enclosed compound around it.

Tunnelling works

Quarter 2 2027 to Quarter 1 2028

Tunnelling works between Shaft 4 (Stockheath Meadow) and the Discharge Chamber to install pipework underground.

Quarter 2 2027 to Quarter 3 2028

Tunnelling works between Shaft 5 (at Purbrook Way) and the Discharge Chamber to install pipework underground.

The tunnelling work will be well below roads, footpaths, public spaces, utilities like gas and water pipes and electricity cables. The route has been carefully designed to avoid passing directly beneath homes, and the pipelines will be installed significantly deeper than any building foundations.

As with all construction projects of this size, we will provide ongoing updates throughout with more information on our planned works.

Final fit-out out of the Discharge Chamber

Quarter 3 2028 to Quarter 4 2028

Once tunnelling work has finished, reinstatement work will start to return the construction area around Shaft W5 to return the area to its original condition.

How the construction work will impact you

Working with local authorities, we have developed plans to manage construction traffic and keep disruption to a minimum. Although every effort will be made to reduce impacts, while work is taking place you may experience:

  • Construction traffic
  • Temporary road access point
  • Control kiosk in place permanently following construction work

Construction traffic

Vehicles will access the site using a designated route from the west via Purbrook Way. A map showing further detail on the route is available on our reservoir pipelines webpages.

On average, each day there will be 2 return trips by HGVs or our tractor and trailer unit. Where possible, journeys will avoid peak times.

Temporary road access point

During the pipelines works, we need to have a dedicated access point in place to allow construction traffic to enter and leave site safely. The site entrance will be on the southern side of Purbrook Way, just to the east of the Hermitage Stream.

The temporary access road leading south from the access point will be installed in the green area on the western side of Corhampton Crescent.

Control kiosk

A small kiosk building, which will be in place permanently, will be installed to house the control systems for the Discharge Chamber. This will be located next to the chamber. The building will be dark green in colour and will be 5.3 metres(m) wide, 3.2m high and 7m long.

It will have fencing around it and new bushes will be planted to provide screening. We’ve included a design image of the kiosk.

How to get in touch

If you have a question or comment, you can send it to us using the ‘Ask us a question’ tool on this page. You can also leave a virtual pin including feedback on our reservoir pipelines online map.

We will also hold a public drop-in session where you can meet our team and raise questions or concerns you may have:

  • Date: 18 November 2026
  • Time: 5pm to 8pm
  • Location: Leigh Park Centre, Dunsbury Way, Leigh Park, Havant PO9 5BG.

Of course, you can contact us by sending an email to havantthicket@portsmouthwater.co.uk, or by calling 023 9249 9888.

And you can write to us at: Havant Thicket Reservoir project, Portsmouth Water, PO Box 99, West Street, Havant, PO9 1LG.

As part of the Havant Thicket Reservoir project, we are installing two pipelines to carry water to the reservoir and supply water when needed.

To construct the pipelines, we will be building a Discharge Chamber that will initially allow us to remove one of our Micro-Tunnel Boring Machines (MTBM) from underground once it has built sections of the pipelines.

The Discharge Chamber chamber will be located in the green open space just south of the western end of Corhampton Crescent, near to the Hermitage Stream.

In the longer-term, the chamber will also form part of the system to allow water from the reservoir to be released in a controlled and safe way into the Hermitage Stream, in the unlikely event that the water levels of the reservoir need to be lowered quickly.

As with all construction projects of this size, we will provide ongoing updates throughout with more information on our planned works.

You can also view an overview map of the reservoir pipelines route and discharge point by clicking here, or access our more detailed online map, where you can give us your comments by placing a virtual pin.

What we will be doing and when

Work at the Discharge Chamber site is due to begin in November 2026 and will be carried out in a series of phases, before being completed in 2028.

Where we are now

Initial work to set up the Discharge Chamber working area should get underway in mid to late November 2026. Before this, we will complete an ecological survey of a tree that may contain bats. Following the survey, the site will be prepared for construction.

Setting up the site will include erecting hoarding and fencing with CCTV for security, installing noise control measures and a temporary site access road leading from Purbrook Way.

What's next

Construction work will begin in early 2027 and will include the following activities:

  • Quarter 1 = January to March
  • Quarter 2 = April to June
  • Quarter 3 = July to September
  • Quarter 4 = October to December

Construction of Discharge Chamber

Quarter 1 2027

The circular chamber will be located south of Corhampton Crescent. Once complete it will be around 13 metres in diameter and 10 metres in depth, with a fully enclosed compound around it.

Tunnelling works

Quarter 2 2027 to Quarter 1 2028

Tunnelling works between Shaft 4 (Stockheath Meadow) and the Discharge Chamber to install pipework underground.

Quarter 2 2027 to Quarter 3 2028

Tunnelling works between Shaft 5 (at Purbrook Way) and the Discharge Chamber to install pipework underground.

The tunnelling work will be well below roads, footpaths, public spaces, utilities like gas and water pipes and electricity cables. The route has been carefully designed to avoid passing directly beneath homes, and the pipelines will be installed significantly deeper than any building foundations.

As with all construction projects of this size, we will provide ongoing updates throughout with more information on our planned works.

Final fit-out out of the Discharge Chamber

Quarter 3 2028 to Quarter 4 2028

Once tunnelling work has finished, reinstatement work will start to return the construction area around Shaft W5 to return the area to its original condition.

How the construction work will impact you

Working with local authorities, we have developed plans to manage construction traffic and keep disruption to a minimum. Although every effort will be made to reduce impacts, while work is taking place you may experience:

  • Construction traffic
  • Temporary road access point
  • Control kiosk in place permanently following construction work

Construction traffic

Vehicles will access the site using a designated route from the west via Purbrook Way. A map showing further detail on the route is available on our reservoir pipelines webpages.

On average, each day there will be 2 return trips by HGVs or our tractor and trailer unit. Where possible, journeys will avoid peak times.

Temporary road access point

During the pipelines works, we need to have a dedicated access point in place to allow construction traffic to enter and leave site safely. The site entrance will be on the southern side of Purbrook Way, just to the east of the Hermitage Stream.

The temporary access road leading south from the access point will be installed in the green area on the western side of Corhampton Crescent.

Control kiosk

A small kiosk building, which will be in place permanently, will be installed to house the control systems for the Discharge Chamber. This will be located next to the chamber. The building will be dark green in colour and will be 5.3 metres(m) wide, 3.2m high and 7m long.

It will have fencing around it and new bushes will be planted to provide screening. We’ve included a design image of the kiosk.

How to get in touch

If you have a question or comment, you can send it to us using the ‘Ask us a question’ tool on this page. You can also leave a virtual pin including feedback on our reservoir pipelines online map.

We will also hold a public drop-in session where you can meet our team and raise questions or concerns you may have:

  • Date: 18 November 2026
  • Time: 5pm to 8pm
  • Location: Leigh Park Centre, Dunsbury Way, Leigh Park, Havant PO9 5BG.

Of course, you can contact us by sending an email to havantthicket@portsmouthwater.co.uk, or by calling 023 9249 9888.

And you can write to us at: Havant Thicket Reservoir project, Portsmouth Water, PO Box 99, West Street, Havant, PO9 1LG.